← Back to Projects

In-House Routing and Labeling Retrofit

Multi-variant manufacturing capability expansion under extreme constraints

Overview

Timeframe: 2024

Category: Manufacturing Systems / Capacity Engineering

Turned idle equipment into a multi-variant routing and labeling cell to cover 19 new products in one week.

The Problem

Production needed new variant routing fast, but capital and time were limited. Buying new automation would cost ~$200K and miss launch.

Constraints

  • 7-day implementation window
  • $800 budget, reuse existing hardware only
  • No unplanned downtime allowed
  • 19 configurations to validate

Approach

I drove the retrofit end to end:

  • Reverse-engineered controls, wiring, and mechanics of the idle cell
  • Rewrote PLC logic and added DataMatrix-driven routing
  • Built new nests and modified shuttles for added variants
  • Offline tested every configuration before production cutover

Tools & Technologies

PLC Programming DataMatrix Scanners Mechanical Design Fixture Mods Production Validation

Impact

19
Variants Added
7
Days to Implement
$800
Total Cost
$200K
Spend Avoided
  • Expanded coverage with zero extra downtime
  • Delivered 250:1 ROI versus buying new equipment
  • Maintained throughput and traceability through the transition

Key Learnings

  • Deep system understanding reveals reuse options fast.
  • Offline prototyping protects production when timelines are tiny.
  • Disciplined documentation keeps retrofits maintainable.